Construction of Villas 1 & 2 is well underway.
Two of our villas have the structure up and the exterior finish applied. Turquoise Banks Villas should be ready to rent Winter of 2021.
Construction of Villas 1 & 2 is well underway.
Two of our villas have the structure up and the exterior finish applied. Turquoise Banks Villas should be ready to rent Winter of 2021.